TracCloudMigration: Difference between revisions
From Redrock Wiki
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
| style="vertical-align:top; padding:20px 20px 20px 2px;" | | | style="vertical-align:top; padding:20px 20px 20px 2px;" | | ||
{| style="width:100%; vertical-align:top; " | {| style="width:100%; vertical-align:top; " | ||
<div style='text-align: center;'> | |||
<big><b> | |||
==Migrating from Trac 4.0 to TracCloud== | |||
</b></div><br> | |||
If you're switching from an existing Trac System to TracCloud and are planning on keeping your current data, a migration process will be needed alongside general setup. This portion of our wiki will outline what this process will look like. | |||
<hr> | |||
<big><b>Step 1. Planning out the migration process</big></b> | <big><b>Step 1. Planning out the migration process</big></b> | ||
Prior to any of the following steps, we'll want to schedule a quick call with you and your IT to plan out this process. This will include a general timeline for TracCloud setup, as well as migration-specific questions and planning, such as data purges or cleanups prior to copying your database. | |||
A call can be scheduled through our website, here: [https://www.go-redrock.com/help-support/request-training/ https://www.go-redrock.com/help-support/request-training/] | |||
<hr> | <hr> | ||
<big><b>Step 2. IT Integrations</big></b> | <big><b>Step 2. IT Integrations</big></b> | ||
Line 14: | Line 22: | ||
We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes: | We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes: | ||
:[https://wiki.go-redrock.com/index.php/TracCloudTechMail Setting up your mail server] | :1. [https://wiki.go-redrock.com/index.php/TracCloudTechMail Setting up your mail server] | ||
:[https://wiki.go-redrock.com/index.php/TracCloudTechImport Importing data from your SIS] | :2. [https://wiki.go-redrock.com/index.php/TracCloudTechImport Importing data from your SIS] | ||
:[https://wiki.go-redrock.com/index.php/TracCloudTechSSO Integrating your campus single sign-on] | :3. [https://wiki.go-redrock.com/index.php/TracCloudTechSSO Integrating your campus single sign-on] | ||
: | :4. Setting up a custom URL (if preferred). | ||
:[https://wiki.go-redrock.com/index.php/TracCloudTechBarcode Configuring barcode scanners] | :5. [https://wiki.go-redrock.com/index.php/TracCloudTechBarcode Configuring barcode scanners] | ||
:Getting a copy of your Trac 4.0 database for steps 3 and 5 (if not hosted). | :6. Getting a copy of your Trac 4.0 database for steps 3 and 5 (if not already hosted). | ||
<hr> | <hr> | ||
<big><b>Step 3. First migration</big></b> | <big><b>Step 3. First migration</big></b> | ||
This | This step is where we bring as much data over as possible from your Trac 4.0 instance. <b>This is also the cutoff point for making additional changes to your Trac 4.0 database</b>. Your Consultants, Centers, Reasons, and more (see chart below) will not be updated during the final migration. Data such as Visits, Appointments, etc can continue to be tracked in the meantime. | ||
<hr> | <hr> | ||
<big><b>Step 4. SysAdmin Training</big></b> | <big><b>Step 4. SysAdmin Training</big></b> | ||
After the first migration, we can start the training process with your SysAdmins. We will be going over the following topics (in roughly this order, and where applicable). | |||
1st Training: Creating Centers, Reasons, and the start of your Profile Prefs. | 1st Training: Creating Centers, Reasons, and the start of your Profile Prefs. | ||
Line 41: | Line 49: | ||
3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists. | 3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists. | ||
4th Training: System Prefs | 4th Training: System Prefs and setting up modules (if applicable). | ||
5th Training: | 5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5. | ||
<hr> | <hr> | ||
<big><b>Step 5. Final migration</big></b> | <big><b>Step 5. Final migration</big></b> | ||
This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc that you've created since the first migration. This is also the step where your Trac 4.0 instance will be | This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc that you've created since the first migration. This is also the step where your Trac 4.0 instance will be disabled, as any data recorded after this point will not be brought into TracCloud. | ||
<hr> | <hr> | ||
<big><b>Step 6. Continued Training</big></b> | <big><b>Step 6. Continued Training</big></b> | ||
After the final migration has been completed, we can go back to the basics to ensure you're comfortable using | After the final migration has been completed, we can go back to the basics to ensure you're comfortable using your new system. | ||
6th Training: Logging visits, using quick and batch visit utilities. | 6th Training: Logging visits, using quick and batch visit utilities. | ||
Line 63: | Line 72: | ||
==What data will be migrated?== | ==What data will be migrated?== | ||
<b><i>What does it mean if something is included in the first migration, but not the second?</ | It's important to understand what data will be brought over from Trac 4.0, what won't, and what data will be deleted during the final migration.<br> | ||
:This indicates that | |||
<b><i>What does it mean if something is included in the first migration, but not the second?</b> <span style="color:green">Yes</span> / <span style="color:red">No</span></i> | |||
:This indicates that this data will be brought over, but any modifications made to this data in Trac 4.0 after the first migration will not be reflected in the final TracCloud migration. An example of this would be Consultants and Centers, if you create a consultant/center after the first migration, it and any associated data will not be brought over during the final migration. This also applies to modifications as well. If you change a consultant's email address in Trac 4.0 post-migration, it will need to be changed again in TracCloud. | |||
<b><i>What does it mean if something is included in the first *and* second migration?</ | <b><i>What does it mean if something is included in the first *and* second migration?</b> <span style="color:green">Yes</span> / <span style="color:green">Yes</span></i> | ||
:This indicates that | :This indicates that this data will be brought over during the first migration, making the data available during the training period, but will also be re-imported during the final migration to catch up on visits/appointments/etc created after the first migration. It's important to note that if you log any visits/appointments/etc during the training process (prior to second migration), this data will be lost after said second migration. | ||
<b><i>What does it mean if something isn't migrated at all?</ | <b><i>What does it mean if something isn't migrated at all?</b> <span style="color:red">No</span> / <span style="color:red">No</span></i> | ||
:This means | :This means that this data-type will not be brought over to TracCloud at all, and will need to be (re)created manually. An example of this would be Permission Groups, as there have been significant changes between the two versions, and it's not possible to create a 1-to-1 replica of a Trac 4.0 group in TracCloud. | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 145: | Line 156: | ||
|} | |} | ||
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
Revision as of 10:22, 1 November 2021
TracCloud Technical Documentation
|
Migrating from Trac 4.0 to TracCloudIf you're switching from an existing Trac System to TracCloud and are planning on keeping your current data, a migration process will be needed alongside general setup. This portion of our wiki will outline what this process will look like. Step 1. Planning out the migration process Prior to any of the following steps, we'll want to schedule a quick call with you and your IT to plan out this process. This will include a general timeline for TracCloud setup, as well as migration-specific questions and planning, such as data purges or cleanups prior to copying your database. A call can be scheduled through our website, here: https://www.go-redrock.com/help-support/request-training/ Step 2. IT Integrations We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes:
Step 3. First migration This step is where we bring as much data over as possible from your Trac 4.0 instance. This is also the cutoff point for making additional changes to your Trac 4.0 database. Your Consultants, Centers, Reasons, and more (see chart below) will not be updated during the final migration. Data such as Visits, Appointments, etc can continue to be tracked in the meantime. Step 4. SysAdmin Training After the first migration, we can start the training process with your SysAdmins. We will be going over the following topics (in roughly this order, and where applicable). 1st Training: Creating Centers, Reasons, and the start of your Profile Prefs. 2nd Training: Profile Prefs. 3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists. 4th Training: System Prefs and setting up modules (if applicable). 5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5. Step 5. Final migration This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc that you've created since the first migration. This is also the step where your Trac 4.0 instance will be disabled, as any data recorded after this point will not be brought into TracCloud. Step 6. Continued Training After the final migration has been completed, we can go back to the basics to ensure you're comfortable using your new system. 6th Training: Logging visits, using quick and batch visit utilities. 7th Training: Creating schedules and booking appointments. 8th Training: Running reports (typically a few weeks after going live). What data will be migrated?It's important to understand what data will be brought over from Trac 4.0, what won't, and what data will be deleted during the final migration. What does it mean if something is included in the first migration, but not the second? Yes / No
What does it mean if something is included in the first *and* second migration? Yes / Yes
What does it mean if something isn't migrated at all? No / No
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||