<big><b>Step 1. Planning out the migration process</big></b> | <big><b>Step 1. Planning out the migration process</big></b> | ||
Schedule a call with us to put together a plan and schedule for the following steps. | |||
<hr> | |||
<big><b>Step 2. IT Integrations</big></b> | <big><b>Step 2. IT Integrations</big></b> | ||
Line 22: | Line 24: | ||
:[https://wiki.go-redrock.com/index.php/TracCloudTechBarcode Configuring barcode scanners] | :[https://wiki.go-redrock.com/index.php/TracCloudTechBarcode Configuring barcode scanners] | ||
<big><b>Step 3. First migration | :Getting a copy of your Trac 4.0 database for steps 3 and 5 (if not hosted). | ||
<hr> | |||
<big><b>Step 3. First migration</big></b> | |||
This first migration will bring much of your data into TracCloud. This is also the point where you will no longer be able to apply changes to your Trac 4.0 instance outside of the basics like Visits, Appointments, and Resource Checkouts. | |||
<hr> | |||
<big><b>Step 4. SysAdmin Training</big></b> | <big><b>Step 4. SysAdmin Training</big></b> | ||
During the initial SysAdmin trainings, we will go over the following topics (in roughly this order): | |||
1st Training: Creating Centers, Reasons, and the start of your Profile Prefs. | |||
2nd Training: Profile Prefs. | |||
3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists. | |||
4th Training: System Prefs such as Custom Fields, Welcome Messages, and Confirm bio options. | |||
5th Training: Setting up modules (if applicable). | |||
<hr> | |||
<big><b>Step 5. Final migration</big></b> | <big><b>Step 5. Final migration</big></b> | ||
This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc that you've created since the first migration. This is also the step where your Trac 4.0 instance will be shutdown, as any further recorded data will not be brought into TracCloud. | |||
<hr> | |||
<big><b>Step 6. Continued Training</big></b> | |||
After the final migration has been completed, we can go back to the basics to ensure you're comfortable using the system. | |||
6th Training: Logging visits, using quick and batch visit utilities. | |||
7th Training: Creating schedules and booking appointments. | |||
8th Training: Running reports (typically a few weeks after going live). | |||
<hr> | |||
==What data will be migrated?== | ==What data will be migrated?== | ||
Line 35: | Line 68: | ||
<b><i>What does it mean if something is included in the first *and* second migration?</i></b> | <b><i>What does it mean if something is included in the first *and* second migration?</i></b> | ||
:This indicates that on top of being available during the training process, it will also overwrite any existing data that was created in TracCloud during the training process. For example, if you log visits during the training process (prior to second migration), this data will be lost after said second migration. | :This indicates that on top of being available during the training process, it will also overwrite any existing data that was created in TracCloud during the training process. For example, if you log visits during the training process (prior to second migration), this data will be lost after said second migration. | ||
<b><i>What does it mean if something isn't migrated at all?</i></b> | |||
:This means the data simply won't be brought into TracCloud, and will need to be (re)created manually. This typically occurs where significant changes are seen, such as your profile prefs and permission groups, where few 1-to-1 options are found. | |||
{| class="wikitable" | {| class="wikitable" |
Revision as of 16:25, 4 October 2021
TracCloud Technical Documentation
|
Migrating from Trac 4.0 to TracCloudStep 1. Planning out the migration process Schedule a call with us to put together a plan and schedule for the following steps. Step 2. IT Integrations We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes:
Step 3. First migration This first migration will bring much of your data into TracCloud. This is also the point where you will no longer be able to apply changes to your Trac 4.0 instance outside of the basics like Visits, Appointments, and Resource Checkouts. Step 4. SysAdmin Training During the initial SysAdmin trainings, we will go over the following topics (in roughly this order): 1st Training: Creating Centers, Reasons, and the start of your Profile Prefs. 2nd Training: Profile Prefs. 3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists. 4th Training: System Prefs such as Custom Fields, Welcome Messages, and Confirm bio options. 5th Training: Setting up modules (if applicable). Step 5. Final migration This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc that you've created since the first migration. This is also the step where your Trac 4.0 instance will be shutdown, as any further recorded data will not be brought into TracCloud. Step 6. Continued Training After the final migration has been completed, we can go back to the basics to ensure you're comfortable using the system. 6th Training: Logging visits, using quick and batch visit utilities. 7th Training: Creating schedules and booking appointments. 8th Training: Running reports (typically a few weeks after going live). What data will be migrated?What does it mean if something is included in the first migration, but not the second?
What does it mean if something is included in the first *and* second migration?
What does it mean if something isn't migrated at all?
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||