TracCloudMigration: Difference between revisions

From Redrock Wiki

No edit summary
No edit summary
Line 219: Line 219:


5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5.
5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5.
<hr>


<big><b>Step 5. Final migration</big></b>
6th Training: Logging visits, using quick and batch visit utilities.


This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc, that you've created since the first migration. This is also the step where your Trac 4.0 instance will be disabled, as any data recorded after this point will not be brought into TracCloud.
7th Training: Creating schedules and booking appointments.


8th Training: Running reports (typically a few weeks after going live).
<hr>
<hr>
<big><b>Step 6. Continued Training</big></b>


After the final migration has been completed, we can go back to the basics to ensure you're comfortable using your new system.
<big><b>Step 5. Final migration</big></b>


6th Training: Logging visits, using quick and batch visit utilities.
This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc, that you've created since the first migration. This is also the step where your Trac 4.0 instance will be disabled, as any data recorded after this point will not be brought into TracCloud.
 
7th Training: Creating schedules and booking appointments.
 
8th Training: Running reports (typically a few weeks after going live).
<hr>
<hr>


Line 368: Line 363:
<hr>
<hr>
|}
|}
[[Category:TracCloud]]

Revision as of 17:26, 20 April 2023


Migrating from Trac 4.0 to TracCloud


If you're switching from an existing Trac System to TracCloud, you have three options of approaching this changeover depending on what will work best for your campus. If you are planning on keeping your current data, a migration process will be needed alongside general setup.

Important Note: If merging multiple Trac 4.0 licenses into a single TracCloud license, the Start Fresh method is required. Only one 4.0 database can be migrated into TracCloud, meaning you do have the option of migrating one license and starting fresh with another if preferred. A complete Visit and Appointment export will be provided in a CSV format for archival purposes.


FastTrac Migration - Jump to

This migration method is best if you would like to expedite your migration to TracCloud. Only one database migration is performed, and we will work with you to setup your TracCloud instance as quickly as possible.
+ Great for campuses migrating in Summer, or during periods of low Trac usage.
+ Faster overall migration time.

- Longer period without full functionality in either Trac System.

Standard Migration - Jump to

This method is best to minimize downtime. Two separate migrations, the first to bring data into TracCloud to train with, leaving Trac 4.0 online in the meantime, and the second to bring over remaining Visits, Appointments, etc, that were tracked between the two migrations.
+ Great for campuses migrating during or between semesters.
+ Minimal time without access to either Trac System.

- Longer overall migration process.
- Partial data freeze requires additional planning in advance.

Start Fresh - Jump to

No migration, and a flexible schedule. No data from Trac 4.0 will be brought into TracCloud, but we can export Visits and Appointments to a CSV file for archival purposes if needed. We will work with your SysAdmins to setup your TracCloud instance from scratch.
+ Great for campuses that want to have a fresh start with their Trac System.
+ Most flexible, as you can complete trainings and go live at any time.

- No Trac 4.0 data will be migrated into TracCloud.


FastTrac Migration

This migration method is best for campuses with multiple licenses, or if you would like to expedite your migration to TracCloud. Only one database migration is performed, and we will work with you to setup your TracCloud instance as quickly as possible.

FastTrac.png


Step 1. Planning out the migration process

Prior to any of the following steps, we'll want to schedule a quick call with you and your IT to plan out this process. This will include a general timeline for TracCloud setup, as well as migration-specific questions and planning.

A call can be scheduled through our website, here: https://www.go-redrock.com/help-support/request-training/


Step 2. IT Integrations

We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes:

1. Setting up your mail server
2. Importing data from your SIS
3. Integrating your campus single sign-on
4. Setting up a custom URL (if preferred)
5. Getting a copy of your Trac 4.0 database for Step 3 (if not already hosted).

Step 3. First migration

This step is where we bring as much data over as possible from your Trac 4.0 instance. Your Students, Visits, Consultants, Centers, Reasons, and more (see chart below).


Step 4. SysAdmin Training

After the data migration, we can start the training process with your SysAdmins. We will be going over the following topics (in roughly this order, and where applicable).

1st Training: Creating Centers, Reasons, and the start of your Profile Prefs.

2nd Training: Profile Prefs.

3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists.

4th Training: System Prefs and setting up modules (if applicable).

5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5.

6th Training: Logging visits, using quick and batch visit utilities.

7th Training: Creating schedules and booking appointments.

8th Training: Running reports (typically a few weeks after going live).


What data will be migrated?

It's important to understand what data will be brought over from Trac 4.0. In the event that a record-type will not be migrated, it will need to be (re)created manually in TracCloud. An example of this would be Permission Groups, as there have been significant changes between the two versions, and it's not possible to create a 1-to-1 replica of a Trac 4.0 group in TracCloud.

Trac 4.0 Data Included in Migration?
Profiles Yes
Profile Prefs No
System Prefs No
Centers/Subcenters Yes
Groups No
Consultants Yes
Users (e.g., SysAdmin accounts) No
Students Yes
Faculty Yes
Reasons Yes
Registrations Yes
Courses Yes
Sections Yes
Class Schedules No
Visits Yes
Appointments Yes
Availabilities No
Static Student Lists Yes
Dynamic Student Lists No
Documents If Needed
Messages Yes
Resources Yes
Resource Checkouts Yes
SAGE Referral Types Yes
SAGE Referrals Yes
SurveyTrac Surveys Yes
SurveyTrac Responses Yes
Q2 Configs No
Whiteboard Rooms No

Standard Migration

This method is best to minimize downtime. Two separate migrations, the first to bring data into TracCloud to train with, leaving Trac 4.0 online in the meantime, and the second to bring over remaining Visits, Appointments, etc, that were tracked between the two migrations.

Screenshot: Migration Timeline visual.


Step 1. Planning out the migration process

Prior to any of the following steps, we'll want to schedule a quick call with you and your IT to plan out this process. This will include a general timeline for TracCloud setup, as well as migration-specific questions and planning.

A call can be scheduled through our website, here: https://www.go-redrock.com/help-support/request-training/


Step 2. IT Integrations

We will be working with your IT throughout steps 3 and 4 to integrate your campus services with TracCloud. This includes:

1. Setting up your mail server
2. Importing data from your SIS
3. Integrating your campus single sign-on
4. Setting up a custom URL (if preferred)
5. Getting a copy of your Trac 4.0 database for steps 3 and 5 (if not already hosted).

Step 3. First migration

This step is where we bring as much data over as possible from your Trac 4.0 instance. This is also the cutoff point for making additional changes to your Trac 4.0 database. Your Consultants, Centers, Reasons, and more (see chart below) will not be updated during the final migration. Data such as Visits, Appointments, etc, can continue to be tracked in the meantime.


Step 4. SysAdmin Training

After the first migration, we can start the training process with your SysAdmins. We will be going over the following topics (in roughly this order, and where applicable).

1st Training: Creating Centers, Reasons, and the start of your Profile Prefs.

2nd Training: Profile Prefs.

3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists.

4th Training: System Prefs and setting up modules (if applicable).

5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5.

6th Training: Logging visits, using quick and batch visit utilities.

7th Training: Creating schedules and booking appointments.

8th Training: Running reports (typically a few weeks after going live).


Step 5. Final migration

This step is where we bring over the remaining data from your Trac 4.0 instance, the visits, appointments, etc, that you've created since the first migration. This is also the step where your Trac 4.0 instance will be disabled, as any data recorded after this point will not be brought into TracCloud.


What data will be migrated?

It's important to understand what data will be brought over from Trac 4.0, what won't, and what data will be deleted during the final migration.

What does it mean if something is included in the first migration, but not the second? Yes / No

This indicates that this data will be brought over, but any modifications made to this data in Trac 4.0 after the first migration will not be reflected in the final TracCloud migration. An example of this would be Consultants and Centers, if you create a consultant/center after the first migration, it and any associated data will not be brought over during the final migration. This also applies to modifications as well. If you change a consultant's email address in Trac 4.0 post-migration, it will need to be changed again in TracCloud.

What does it mean if something is included in the first *and* second migration? Yes / Yes

This indicates that this data will be brought over during the first migration, making the data available during the training period, but will also be re-imported during the final migration to catch up on visits/appointments/etc created after the first migration. It's important to note that if you log any visits/appointments/etc during the training process (prior to second migration), this data will be lost after said second migration.

What does it mean if something isn't migrated at all? No / No

This means that this data-type will not be brought over to TracCloud at all, and will need to be (re)created manually. An example of this would be Permission Groups, as there have been significant changes between the two versions, and it's not possible to create a 1-to-1 replica of a Trac 4.0 group in TracCloud.
Trac 4.0 Data Included in First Migration? Included in Second Migration?
Profiles Yes No
Profile Prefs No No
System Prefs No No
Centers/Subcenters Yes No
Groups No No
Consultants Yes No
Users (e.g., SysAdmin accounts) No No
Students Yes Yes
Faculty Yes Yes
Reasons Yes No
Registrations Yes Yes
Courses Yes Yes
Sections Yes Yes
Class Schedules No No
Visits Yes Yes
Appointments Yes Yes
Availabilities No No (Only for testing)
Static Student Lists Yes Yes
Dynamic Student Lists No No
Documents If Needed If Needed
Messages Yes Yes
Resources Yes No
Resource Checkouts Yes Yes
SAGE Referral Types Yes No
SAGE Referrals Yes Yes
SurveyTrac Surveys Yes No
SurveyTrac Responses Yes Yes
Q2 Configs No No
Whiteboard Rooms No No

Start Fresh

No migration, and a flexible schedule. No data from Trac 4.0 will be brought into TracCloud, but we can export Visits and Appointments to a CSV file for archival purposes if needed. We will work with your SysAdmins to setup your TracCloud instance from scratch.

9498519.png


Step 1. Planning Call

Prior to the following steps, we'll want to schedule a quick call with you and your IT to plan out this process. This will include a general timeline for TracCloud setup, who we should contact for Step 2 processes, and to answer any general questions before starting.

A call can be scheduled through our website, here: https://www.go-redrock.com/help-support/request-training/


Step 2. IT Integrations

We will be working with your IT throughout the training process to integrate your campus services with TracCloud. This includes:

1. Setting up your mail server
2. Importing data from your SIS
3. Integrating your campus single sign-on
4. Setting up a custom URL (if preferred)

Step 3. SysAdmin Training

Once your system is online, we can start the training process with your SysAdmins. We will be going over the following topics (in roughly this order, and where applicable).

1st Training: Creating Centers, Reasons, and the start of your Profile Prefs.

2nd Training: Profile Prefs.

3rd Training: Creating Groups, Staff (aka Users/Consultants), and Course Lists.

4th Training: System Prefs and setting up modules (if applicable).

5th Training: Continuing System Prefs and modules, as well as addressing any final questions before step 5.

6th Training: Logging visits, using quick and batch visit utilities.

7th Training: Creating schedules and booking appointments.

8th Training: Running reports (typically a few weeks after going live).